June 2008 Pictures
Hacksawed out the canopy frame (roll bar) attach angles
An amazing amount of work on this sucker
Notching for the angles
Double checking the amount of tilt
Right and left fuel tank vent tubes
Brake master cyliners installed
Installing the fuel lines, very challenging.
Here's both the fuel and brake lines installed.
Brake fluid reservoir
Panel attach angles
Subpanel
I taped my radio stack trays together to get an idea on fit
Lauren came out this morning Sat June 28th. Kind of special because she's 3 years old today.
Pretty much the final panel layout. (Although who knows if it really will be by the time I'm done)
A step up moment, time to start cutting!
Back